List of projects

S/N DESCRIPTION CLIENT CONTRACTOR STATUS DATE

1.

Replacement of stolen Ebgoro 4 F/L 91.9Km) from Ebegoro 1 flowline & Connection to Ebegoro 7 (4.5km)

NAOC/ RIVER CREEK

B+G&S

Completed

Jan 2011

2.

Removal of bunkering point on 10" IRRI-Kwale pipeline at Agwe-Etiti

NAOC

B+G&S

Completed

March 2011

3.

Laying of 5km dual string 4'' sch APL 5l grade x52 flowline from ebegoro 4 location to ob/ob gas plant

NAOC

B+G&S

Completed

April 2011

4.

12" and 18" casing major road crossing (Thrustboiring) of Omoku Ebegoro road and Omoku-Obikorom road along Ebegoro "M" row

NAOC

B+G&S

Completed

June 2011

5.

Layingg of 3.5KM dual string 4" buried flowline from Oleh B location to Irri Flow station

NAOC

B+G&S

Completed

Sept 2011

6.

Modification of well 3&4 arrival line and oleh B slots in irri flowstation arrival manifold

NAOC

B+G&S

Completed

Sept 2011

7.

fabrication and supply of 4 nos sand traps

NAOC

B+G&S

Completed

Nov, 2011

8.

Oleh 2 long string 4" By-pass flowline installation by hot tapping.

NAOC

B+G&S

Completed

Dec. 2011

9.

Layingg of 3.5KM dual string 6" buried flowline from Oleh C location to Irri Flow station

NAOC

B+G&S

Completed

Jan 2012

10.

Modification of 10" Irri-kwale gas arrival at OB/OB gas plant including a 10 " hot tapping

NAOC

B+G&S

Completed

Jan 2012

11.

4" flowline laying at EBocha 23 (Location 7) to Ebocha oil centre and wellhead materials

NAOC

B+G&S

On-going

NOV 2012

12.

Spill detection Multipoint Acoustic sensing project for Kwale flowstation

NAOC

B+G&S

Completed

JUNE 2013

13.

Spill detection Multipoint Acoustic sensing project for Akri flowstation

NAOC

B+G&S

Completed

JUNE 2013

14.

Laying of Add. 2km Flowline Ebegoro 4" OB/OB

NAOV

B+G&S

Completed

August 2013

15.

Installation of sections of 36" ELP II (Escravos- Lagos) pipeline by thrustboring method

ZAKHEM/NNPC

B+G&S

Completed

16.

Ogbainbiri Crude Oil storage tank EPC project (Dia 33m x 15m height) - EPC for upgrading of Ogbainbiri flowstation

NAOC

B+G&S

Completed

17.

Installation of Alfa Laval Heat Exchanger at Ob-Ob gas plant

NAOC

B+G&S

Completed

18.

Samabiri Wellhead control panel upgrading

NAOC

B+G&S

Completed

19.

Lagos Ijegun petroleum storage tank foundation

EARTHCORE ENGINEERING

B+G&S

Completed

20.

Replacement of 6" Schedule 120 flowlines for Ebocha water reinjection project

NAOC

B+G&S

Completed

21.

Simultaneous Water and Natural gas disposal (SWAN)

NAOC

B+G&S

Completed

22.

Kpone Independent Power Plant Project Tema Ghana

AB Engineering Company Limited

B+G&S

On-going

23.

Ultrasonic Gas Metering system, OB/OB Gas plant

NAOC

B+G&S

On-going