Trenchless Crossing of AKK Road Project by Thrust Boring Technology for Brentex CPP, Kaduna – Nigeria

The Ajaokuta–Kaduna–Kano (AKK) pipeline is a 614km-long pipeline being developed by Nigerian National Petroleum Corporation (NNPC) to transport natural gas from southern Nigeria to central Nigeria. The $2.8bn pipeline project represents phase one of the 1,300km-long Trans-Nigerian Gas Pipeline (TNGP) project, which is being developed as part of Nigeria’s Gas Master Plan to utilize the country’s surplus gas resources for power generation as well as for consumption by domestic customers.
This project also forms part of the proposed 4,401km-long Trans-Saharan Gas Pipeline (TSGP) to export natural gas to customers in Europe. The Ajaokuta–Kaduna–Kano (AKK) pipeline will transport up to 3,500 million cubic feet (mcf) of gas a day from various gas gathering projects in southern Nigeria. Hydrocarbon liquids will be processed at Ajaokuta to produce liquefied petroleum gas (LPG), while the remaining gas will be transported to supply feedstock for new power plants and petrochemical facilities at Abuja, Kaduna, Kano, and Katsina. A consortium of Brentex and China Petroleum Pipeline Bureau (CPP) who were also awarded the EPC contract for the 221km Kaduna-Kano section of the pipeline contracted us to carry out Trenchless crossing of 12 Nos. road/rail crossings of 56” casing pipe with 40” product pipe by the method of thrust boring.