Projects
The first phase of this project involved advanced piling operations using state-of-the-art drilling equipment. Our skilled engineers and technicians executed deep foundation drilling with high precision, ensuring stability and durability for the structure to be erected. Safety remained our top priority throughout the process, with our crew fully kitted in standard PPE and working under strict compliance with international HSE standards.
Reinforced Foundations for Strength and Durability
Following the drilling phase, we successfully installed reinforced steel cages into the boreholes, preparing a solid base for concrete placement. This stage is crucial for long-lasting infrastructure, and our team ensured every reinforcement was aligned to specification and quality-tested. With careful excavation, reinforcement placement, and controlled backfilling, we delivered a foundation system designed to carry heavy structural loads efficiently.