Deep Foundation Piling by Continuous Flight Auger(CFA) Method for Globestar at Koko, Delta State
Contracted by Globestar LTD to fabricate 202 Nos. reinforcement cage, drill 600mm x 21m depth, concrete barging, and install 202 piles by the method of Continuous Flight Angering (CFA) at Koko, Delta State. This project was carried out as a foundation base for the installation of storage tanks.