Sectional Replacement Of 17km Clough Creek –tebidaba Bulk Line Project
NAOC detected a leakage on Clough-Creek – Tebidaba pipeline which happened due to vandalization. This called for pipeline sectional replacement. The total line vandalized was 17km of 10’’ line. The detailed engineering, procurement and construction of the project was handled by BGS which involves replacing 10” vandalized part with 12” new line in a Swampy area.
This project also involves 3 Nos. River crossings which was carried out by method of Horizontal directional drilling(HDD). This project was done in 2021 for NAOC at Tebidaba community in Bayelsa State.